Project Details

PARKWIDE
SPECIFICATIONS

4-BUILDING INDUSTRIAL PARK

BUILDING 1

±295,573 SF

BUILDING 2

±451,880 SF

BUILDING 3

±248,453 SF

UNDER CONSTRUCTION

BUILDING 4

±74,500 SF

BUILDING SPECIFICATIONS

Acreage

±149 acres

Clear Height

32’-40’

Column Spacing

​ 50’ x 56’ (typical) with 60' speed bays

Loading

As outlined, all 9'w x 10'h loading dock doors
All with vision panels, bumpers/seals and 35,000 - 45,000 lb levelers

Truck Court Depth

135' minimum with 60' concrete apron

Sprinkler

ESFR system

Lighting

LED fixtures providing 30-foot candles at 3' above finished floor with 25' whips

Electrical

277/480V; 3 phase; 3,000A service (expandable)

Roof

60 mil, single ply reinforced TPO membrane with insulation

Floor Slab

7” thick concrete slab on grade, 4,000 PSI unreinforced concrete over 12” stone base
Designed to average 500lb/SF and Ff50 Fl30 floor flatness/levelness; two coats sealer

HVAC

Gas-fired, minimum 8 BTU/SF

Structural/Foundation

Tilt-up concrete with conventional steel frame

Zoning

Business District

PARK UTILITIES

Electrical Capacity

21 megawatts total power; three 13.8 kVA feeders with automatic transfer switches, rate at 7 MW each

Stormwater

Full stormwater management system to meet DEP regulations

Water/Sewer

12" water line; 8" sewer line

PROPOSED HIGH-BAY WAREHOUSE

Silver City Business Park​ offers ± 149 acres​ of easily accessed land that can accommodate over 1 million square feet​ of development of industrial space. Taunton is a premier pro-business community​ that provides the workforce, financial incentives, upgraded utilities, and direct highway accessibility to create an institutional-quality business park. Upgraded infrastructure is in-place​ at Silver City, including high-capacity utilities, an exclusive ramp to the Route 140/Route 24 onramp, and ample land with ideal topography​ for generous truck courts and flexible parking throughout.

BUILDING USES

E-COMMERCE/LOGISTICS

MANUFACTURING

BIOMANUFACTURING

COLD STORAGE

R&D/FLEX

UTILITIES & PROVIDERS

ELECTRICAL:​ TAUNTON
MUNICIPAL LIGHT PLANT WITH 21 MEGAWATT EXISTING POWER

GAS:​ COLUMBIA GAS

WATER/SEWER:​ CITY OF TAUNTON

TELECOMMUNICATIONS:​ COMCAST/VERIZON

master site plan

CONTACT

JOHN LASHAR
Vice Chairman
+1 617 439 7887
john.lashar@cbre.com

STEVE CLANCY
Executive Vice President
+1 617 912 7055
steve.clancy@cbre.com

ROB BYRNE
Executie Vice President
+1 617 827 7486
robert.byrne1@cbre.com

CHRIS MULLEN
Senior Vice President
+1 617 933 0177
chris.mullen2@cbre.com

DANIELLE FRISCH
SeniorVice President
+1 781 964 0575
danielle.frisch@cbre.com

KENDALL LYNCH
Vice President
+1 781 812 6435
kendall.rowley@cbre.com

JULIANA FIORE
Senior Associate
+1 781 801 3423
juliana.fiore@cbre.com

Interested in viewing other properties? Visit CBRE’s Global Listings​ to explore additional availabilities

©2023 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners, and the use of such logos does not imply any affiliation with or endorsement of CBRE. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited.